Project description: Complete renovation- with interior design work Location: Budapest, VI. district, Lázár street 20. Built area: 40 sqm Total investment cost: HUF 8 million Date of handover: 2014. június 15.
Project description: Complete renovation- with interior design work Location: Budapest, VI. district, Lázár street 20. Built area: 40 sqm Total investment cost: HUF 8 million Date of handover: 2014. június 15.
Project description: complete housing renovation Location: Budapest, V.ker., Nádor utca 24. Built area: 34 sqm Total investment cost: HUF 4.5 million Date of handover: 2011
Project description: Establishment of an Investment Service Provider Location: Budapest, VII. district, Nyár st. 12 12. Built area: 170 sqm Total investment cost: 5 million Ft Delivery date: 2011. október 10. 2011 Complete building renovation:...
Project description: Construction of a new bathroom, complete renovation of existing water blocks, painting of rooms and electrical installation works Location: Budapest, XIII. district, Lehel st. 59. Building “C” R. K. Mk. Meddőségi Centrum -...
Project description: Complete design of sterilization room and renovation of garbage storage in the basement Location: Budapest, XIII. district, Lehel st. 59. Building “C” R. K. Mk. Meddőségi Centrum - basement Built area: 60 sqm...
Location: Budapest, VI. district Rózsa street Built area: 32 sqm Total investment cost: (renovation cost):HUF 3 million Date of handover: 2009
Monument building Renovation Renovation of the entire facade of the house on Rózsa Street. The aim of the 3-month project was to give the house a completely renovated look.
Location: Budapest, XI. Somogyi st. Built area: 47 sqm Total investment cost: (renovation cost): HUF 4 million Date of handover:2008
Location: Budapest, V. distr. Szent István blvd. Built area: 100 sqm Total investment cost: (renovation cost): HUF 9 million Date of handover: 2010
Project description: attic installation, facade renovation Location: Budapest, XIV. district, Törökör street Built-up area: 130 sqm Total investment cost: HUF 19 million Date of handover: 2001