Laborc street

Type of development: luxury condominium in Buda - Project Management Location: Budapest, III. district, Laborc street 69. Realization: 2008. III. quarter Architect Hevesi and Papp Architectural Office Seller: Otthon Centrum Built area: 1000 sqm Number...

LÁZÁR STREET

Project description: Complete renovation- with interior design work Location: Budapest, VI. district, Lázár street 20. Built area: 40 sqm Total investment cost: HUF 8 million Date of handover: 2014. június 15.

MKB Bank Zrt.

Preparation of property project studies, conducting detailed market researches and thorough review of the buildings’ technical characteristics. Develop a sales strategy by determining the sales price. Budapest, II. district Pitypang street – family house Budapest,...

Mór Hospital

Project description: Project management expert activity Location: Mór Built area: 3,000m2 Total investment cost: HUF 1 billion with European Union support Date of handover: 2010

Nádor street 24

Project description: complete housing renovation Location: Budapest, V.ker., Nádor utca 24. Built area: 34 sqm Total investment cost: HUF 4.5 million Date of handover: 2011

Nagy Ignác street

Purchase of the entire residential building, preparation of a 90-room hotel The 5. There is a plot with a building waiting to be demolished (639 sqm) close to Nyugati tér in the 5th district, in...

Olajág Nursing Home

Csepel (1214 Budapest, Tejút st. 1., Rakéta st. 7-11.) Total buildings: 11,769 sqm Bank Street (1154 Budapest, Bánkút st. 67-69) Total buildings: 16,043 sqm Matthias Square (1087 Bp., Mátyás square 6.) Total buildings: 2,404 sqm...

Orsó street

7-apartment condominium Volume: 700m2 The 7-apartment condominium is located in the II District. It is in one of the most elegant areas of the district, in close proximity to Pasaréti Square. Located in a quiet,...

NURSERY ENERGETIC MODERNIZATION

KEOP 5.3.0 / A / 09-2010-0093 in the framework of the tender for the improvement of building energy efficiency Location: Budapest, VII. district, Dohány u. 32 32 Built-up area: 3500 sqm Total investment cost: HUF...